search
banner

Waste To Energy (WTE) Campus

Category

Waste To Energy (WTE) Campus Projects

1 results

Posted On September 14, 2024

This is India’s First Platinum-Rated Net-Zero Green Waste to Energy Plant | INI Design Studio

The 7825 sqm Waste to Energy Plant project at Jamnagar, Gujarat, converts 2,20,000 tons/year of MSW into 7.5 MW clean energy. It is enough to power 15000 homes, with zero...

  • Magazine December Edition 2024