search
  • Chapdi Stone Shapes A Home + Office Rooted In Bangalore’s Traditions | Play Architecture

    The design draws inspiration from an ephemeral moment in a South Indian temple complex. As the setting sun moves across the space, the stone appears lighter and less dense. This creates a poetic and intangible relationship with the material.

    Bangalore and Karnataka share a long association with chapdi, a local natural stone slab that is typically 100 mm thick. Yet its aesthetic and structural qualities remain relatively underexplored. The project brings greater attention to the material and its inherent character.

    Chapdi Stone Shapes A Home + Office Rooted In Bangalore’s Traditions | Play Architecture

    home + office

    Stone has the least carbon footprint as a building material, making it the most versatile construction material since historical times. The traditional architecture of this region and its surroundings has reached a remarkable level of integrity and profundity by working with stone. In modern times, however, stones are often relegated to mundane functions like footpaths, drain covers, and compound/partition walls in villages. Chapdi in this project, however, becomes the protagonist.

    home + office

    The narrative shifts to a north-facing residential site owned by an architect and his wife, measuring 4000 sq. ft., within a picturesque neighborhood abutting a national zoological park in Bangalore, Karnataka, India. This residential layout was once a stone quarry, which, post-abandonment, was filled in to form a residential community. The site now spans 100 acres, surrounded by a series of lakes, quarries, and other residential communities.

    Nine-Square Planning

    OH HO (conceived as a home + office) explores the contextual relevance and versatility of the traditional Indian planning principle of nine squares, with the central square being an open courtyard. Drawing from this tradition, OH HO challenges and pushes chapdi‘s structural possibilities through its innovative, interlocking carpentry joinery-like approach, using stone in its purest form.

    home + office

    home + office

    home + office

    Climate-Led Planning

    The building footprint is 36′ x 36′, divided into nine modules of 12′ x 12′ (a dimension determined by the stone’s transportation limitations), set within a site measuring 80′ x 50′. The site features a large front yard shaded by trees and a small backyard, allowing soft, diffused light and air movement from the north. The south, east, and west sides have lesser setbacks and high gabion-type compound walls (recycled from stone left over in the construction process) to provide privacy and enhance the mutual shading of the building’s primary walls from harsh direct solar radiation.

    The change in tectonics and order brings about a transformation in experience, allowing the surfaces to evolve into a sleek, minimal structural system. The project removes redundancy in the design and manifestation process, resulting in an architectural expression that embodies its integrity. Foreseen as a safe haven for the couple, whose arduous journey was marred by chronic ailments, the house had to address wellness at both psychological and physiological levels. It features large openings to bring in ample light and breeze, yet maintains privacy and provides warmth when needed.

    Layered Climate Response

    Bangalore boasts a pleasant summer in the shade and a moderately cold winter. With layers of walls and roofs, the design is more effective in providing privacy, thermal comfort, and openness simultaneously. With decreasing water systems, the building becomes an apparatus to collect rainwater momentarily, converting into an aquatic, pond-like ecosystem before allowing the water to flow along the surface and be collected in the community lake.

    Fact File

    Designed by: Play Architecture

    Project Type:  Residential Architecture Design

    Project Name: OH HO Residence

    Location: Bangalore

    Year Built: 2023

    Project Size: 1883.68 Sq.ft

    Design Team: Devendra Kumar, Harish Thirugnanam, Joshin Rose, Nila Bharathi, Periyasamy Palanisamy, Ralbin Veniel, Senthil Kumar Doss, Shivani Saran, Suba Lakshmi

    Photograph Courtesy: Archana Vikram, studio f8 & Senthil Kumar Doss

    Structural Consultant: Manjunath & Co (Manjunath Bharathi Lakshminarayan)

    Landscape Consultant: Genesis Landscape Studio (Priya Rangaraju)

    Project Manager: JK Construction (Kumar Perumal)

    Stone Construction: SS Stones (Syed Ghouse)

    Carpentry And Glass: Rahul Associates

    Landscape Contractor: The Tellus Enterprises Landscapers & Floriculturists

    Electrical Contractor: Naveen Kumar

    Plumbing Contractor: JK Construction (Lakshmanan)

    Source: Archdaily

    Firm’s Website Link: Play Architecture

    Firm’s Instagram Link: Play Architecture

    For Similar Projects > A Fusion of Minimalism, Muted Tones and Contemporary Aesthetics

    Brick Architecture And Local Materials Shape Coffee Sangam’s Contextual Character | Studio Vriksh

    Editor’s Note: Some places feel rooted because they belong to their surroundings rather than trying to stand apart from them. Coffee Sangam in Andhra Pradesh takes this approach through a raw, tactile palette of brick, stone, teak, and mild steel. The random rubble compound wall extends the landscape into the architecture, while the Corten steel […]

    Read More

    South Facing Home Adapts Indian Design To An Evolving Family | GreyHatch Architects

    Envisioned as a contemporary home rooted in Indian sensibilities, this residence sits on a south-facing urban plot. The design accommodates the evolving lifestyle of a multi-generational family. The project integrates architecture and interiors to create functional, climate-responsive, and emotionally connected spaces. Each level balances privacy with interaction. The design also allows flexibility for changing family […]

    Read More

    Chennai Residence Uses Brickwork To Give A Narrow Facade Texture | Art & Architecture

    Editorial Note: Some homes are shaped by the memories, objects, and stories their residents carry with them. Ungana in Chennai, meaning “merge” in Swahili, brings together a well-travelled family’s collection of antiques and everyday rituals within a narrow urban plot. A double-height living space becomes the heart of the home, connecting the kitchen and dining […]

    Read More

    House Of The Framed Atrium Gives Vertical Living A Nature Filled Heart | Redwall Design Studio

    House of the Framed Atrium explores how a contemporary home can revolve around light, connection, and shared experiences. The design follows the ideas of a Living Atrium, Living with Nature, Framed Volumes, Vertical Living, and Timeless Materiality. The residence connects a sequence of interconnected spaces around a dramatic triple-height atrium. The atrium forms the heart […]

    Read More

    A Mock-up Becomes A Home Through Indian Brick Bonds in Tamil Nadu | Earthscape Studio

    A Mock-up That Became a Home – For an architecture practice, a mock-up often helps test an idea before the team translates it into a larger project. It allows architects to work at full scale, examine materials and construction techniques, and understand their limitations. The process also gives them room to test different brick bonds and […]

    Read More

    A Courtyard Home in Kannur, Kerala Designed Around Light and Landscape | Raw Collective Architecs 

    The house began not with a formal brief, but with a conversation about the kind of life the clients hoped to build within it. Set between the denser urban fabric of Kannur and the quieter residential landscapes of North Kerala, the project responds to a desire for openness and connection. At the same time, the […]

    Read More

    The Main Concept Of This Home Revolves Around A Fluid, Light-Filled Home | ARKA Architects

    “Pravah” — A House That Breathes is envisioned as the main concept of this home revolves around a fluid, light-filled home where architecture becomes a continuous experience of movement, air, and connection. Located in Pal Gamtal, Surat, the project is a residential redevelopment on a 1,850 sq.ft. plot within a dense urban fabric. The site, […]

    Read More

    15 Courtyards in Houses: Designing Tranquil Spaces That Elevate Homes

    Timeless architectural features, such as courtyards, are always associated with bringing the naturally public forms to the world’s heart, building the most peaceful, secluded outdoor areas. These outdoor spaces maximize the living experience with their private space feature, which gives one the option for leisurely relaxation, recreation, or gardening. Furthermore, it has also been a […]

    Read More

    15 Architecture Fonts Every Architect Should Know

    Architecture font choices go beyond style—they shape how your work is perceived. From portfolios to presentations, the right architecture font instantly communicates clarity, precision, and personality. As architects, we design not just with space but with every detail, including typography. Selecting a strong architecture font shows your commitment to visual storytelling and design consistency. In […]

    Read More

    Farmhouse Designs in India: 15 Inspiring Styles To Know

    The Indian farmhouse accommodation goes on to capitalize on a mature evolutionary synthesis of ancestral aesthetics and contemporary features. With this, the outside and the inside of farmhouses became places of comfort with nature. In this blog, we delve into 15 incredible farmhouse designs that entail a harmonious blending. While they exhibit different spaces in […]

    Read More
  • South Bombay Finds A New Language Of Luxury Through Tressoro Bombay | DR&W: Design, Research and Workshop

    How a Cooling Pillow Draws Heat Away for a Better Night's Sleep